23 Eylül 2021

  1. Internal installation, IP23, will be custom
  2. manufacture with ALCE current and potential transformers.
  3. Analog ampermeters and voltmeters over the panel.
  4. RAL 7032 powdercoating for resistance to
  5. humid conditions in the powerplant building.
  6. Easy access to cabling and bus bars in the panel.
  7. Eelectronic locks prevent opening of the door if there is energy